DJI T100 T70P lift loading unloading operation sequence

DJI T100/T70P Lift Operation Guide: Loading, Unloading, 3–4 m Descent, 6 m Clearance & Auto Balance

Once task points are planned, DJI's lift manual uses a deliberate cargo-grounding and crew-separation procedure. The aircraft is not kept hovering directly over people while they handle the load. Instead, the sling or cargo is placed on the ground, the aircraft descends farther to release tension, and the aircraft moves away before the crew approaches.

Quick Answer: Manually take off, select the destination, and let the aircraft fly to it. Tilt the FPV camera downward and use AR projection to check the area. Lower the aircraft until the sling/cargo touches the ground, then continue descending 3-4 m. Move backward or another people-free direction about 6 m and hover before the ground crew loads or unloads. After ground work, return above the point and continue to the next destination. DJI says the 3-4 m and 6 m figures are recommended values that should be adjusted for the actual sling length and surroundings.

T100 T70P lift operation fly verify lower cargo clear crew zone
The manual's cargo-handling sequence translated into a field reference.

1. Manually take off and select the destination

Manually control the aircraft to take off, then select the destination point on the map. The aircraft will automatically fly to the selected destination.

2. Use the FPV camera and AR projection to inspect the destination

When the aircraft reaches the destination, tilt the FPV camera downward. DJI says the AR projection can then be used to confirm the safety of the surrounding environment before lowering the cargo.

3. Touch the cargo down, then descend another 3-4 m

Control the aircraft directly above the destination point and lower it until the sling or cargo touches the ground. DJI then recommends continuing to descend another 3-4 m. That extra descent reduces tension before the crew begins handling the load.

4. Move about 6 m away before ground crew approach

Fly backward, or in another direction where no people are present, about 6 m and hover. Only then should the ground crew unload or load cargo.

5. Return above the point and continue the task

After ground operations are complete and the crew has moved to a safe area, fly directly above the destination point and select the next destination on the map.

Manufacturer T70P T100 Lift System performing an operation page
Manufacturer source page for the five-step cargo-handling sequence.

Manual flight to the load point is also allowed

The manual says operators can manually fly to a loading or unloading location without planning task points. The rest of the loading/unloading sequence remains the same.

The 3-4 m and 6 m figures are recommended values

DJI explicitly states that the descent height and movement distance are recommendations. Adjust them according to actual sling length and the surrounding environment. The separate rigging guide covers DJI's 10-15 m sling length and other sling/hook replacement requirements.

Auto Balance Control for cargo swing

DJI Agras Auto Balance Control cargo swing and battery overheat response
Balance control and overheating response from the manual's safety section.

DJI Agras can enable Auto Balance Control and set the control angle. If Auto Balance Control is not enabled and the swing angle becomes too large, use Balance Control in Operation View. Watch the surrounding environment during balancing so the corrective movement does not create a collision risk.

Manufacturer T70P T100 Lift System Auto Balance and battery overheat warnings
The source also instructs operators to land or return promptly when the aircraft/cargo is abnormal.

Battery overheating during continuous operations

If DJI Agras indicates the battery is overheating during continuous operations, promptly land the aircraft to prevent battery damage.

Stop and land or return when something is abnormal

During the operation, continuously watch aircraft and cargo status. If an abnormality occurs, DJI says to promptly land or return.

Lift-system service paths

For T100 rigging hardware, the current catalog includes the OEM Lifting Hook, OEM Lifting Rope and OEM Damper Hook. The complete T100 assembly path is the T100 OEM Payload Lifting System Kit. For T70P, use the T70P OEM Lifting System.

Parts & Equipment Referenced in This Guide

Shop Related Collections

Related Tutorials

Source and revision note

Primary source: DJI T70P / T100 Lift System User Manual v1.0 (2025.07), sections 1.3 and 3.2.

Back to blog

Leave a comment